|
I hear a late casing was applied today..very late, on top of the older casing. The overlay on the old casing layer causes any water to just pool there. Hopefully this impromptu casing layer will finish this flush out nicely.
Water was added 15 hours b4 these pics, by spraying it down the sides of the casing which have shrunken away by a centimeter or so. All of this water seems to have been absorbed and a little more was added at the time of these pics.
I think this is a sweet pinset for this size casing but dont know how well it can support it. Seems like a lot of toothpicks in there, but alot of them still have a way to go.
__________________ "The smoke can do anything. It will give you not only knowledge, but also the means to proceed."-Carlos Castaneda |